
4-12 Hardware installation: Intelligent Peripheral Equipment module
553-4001-111 Standard 1.0 March 1997
Figure 4-3
Meridian MAX IPE/IPE-E installation overview—Option 11
Modem
Supervisor
Maintenance
console
Reports
workstation
Example of
Option 11 containing Meridian MAX
IPE/IPE-E module
(actual configuration may differ)
printer
High-Speed
Link
Load Management
Four-port I/O cable
These cables are used.
LAN connection
Diagnostic
modem
Link
NAC
network
link
Supervisor
dial
-up
Cable
NT1R03BA
Cable
NT1R03AA
LAN
Local
printer
PC using
MTE
Cable
NT1R03CA
Cable
NT1R03CA
Note:
The system console is connected to Port 1, remote diagnostics is connected to Port 2, and the
High-Speed Link is connected to Port 8.
For more information on the configurations available, refer to
the “Capacities” section in the “Site preparation” chapter.
Modem
Cable
NTAK19XA
Kommentare zu diesen Handbüchern