Hp ProLiant ML110 G7 Server Bedienungsanleitung Seite 48

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 113
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 47
Hardware options installation 48
6.
Install the DIMM.
7. Install the access panel (on page 21).
8. Lock the tower bezel.
9. Connect each power cord to the server.
10. Connect each power cord to the power source.
11. Power up the server (on page 19).
Expansion board options
The server supports PCIe Gen 2 expansion boards.
Installing an expansion board
1. Power down the server (on page 19).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Unlock the tower bezel ("Unlock and open the tower bezel" on page 20).
4. Remove the access panel (on page 21).
5. Remove the air baffle (on page 22).
6. Open the expansion slot cover retainer.
Seitenansicht 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 112 113

Kommentare zu diesen Handbüchern

Keine Kommentare