HP S10 Bedienungsanleitung Seite 108

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 134
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 107
106 Operating Requirements
If both ends of the Fibre Channel cable are between the limits listed in step 5, the two
long-wave hubs are verified for cascading up to 10km using this cable plant. If the meter
readings are not within range, verify that the Fibre Channel cable is securely connected to
the hubs long-wave port. Also verify, that the cable connectors are clean by wiping them
with a lint-free cloth dampened with reagent grade isopropyl alcohol and blowing the
connectors dry with clean, compressed air.
Seitenansicht 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 133 134

Kommentare zu diesen Handbüchern

Keine Kommentare