Operations 28
5.
Install the PCI riser cage.
6. Install the access panel (on page 23).
7. Install the server into the rack ("Installing the server into the rack" on page 35).
8. Connect each power cord to the server.
9. Connect each power cord to the power source.
10. Power up the server (on page 21).
Secure the full-length expansion board retainer
1. Power down the server (on page 21).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Extend the server from the rack (on page 21).
4. Remove the access panel (on page 22).
5. Install a full-length expansion board ("Installing a full-length expansion board" on page 64).
6. Install the PCI riser cage (on page 27).