
Appendix A
Installation Checklist
Using the Checklist
86
Using the Checklist
The checklist provided here is an installation aid and should be used only after you have installed a few
systems using the detailed procedures described in the body of this manual. This checklist is a compilation of
the tasks described in this manual.
The checklist is organized as follows:
PROCEDURES The procedures outlined in this document in order.
IN-PROCESS The portion of the checklist that allows you to comment on the current status of a procedure.
COMPLETED The final check to ensure that a step has been completed and comments.
Major tasks are in bold type, subtasks are indented.
Table A-1 Factory-Integrated Installation Checklist
PROCEDURE IN-PROCESS COMPLETED
Initials Comments Initials Comments
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
Inspect shipping containers
for damage
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Kommentare zu diesen Handbüchern