HP Server rp8400 Installationsanleitung Seite 55

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 94
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 54
Chapter 4
AC Power
Wiring and Voltage Checks
55
Safety Ground Verification (Dual Power Source)
This procedure measures the voltage level between A0 and A1, between B0 and B1, between A0
and B0 and between A1 and B1. All measurements will be taken between ground pins. Refer to
Figure 4-3 for ground reference points when performing these measurements.
Figure 4-3Safety Ground Reference Check - Dual Power Source
Step 1. Measure the voltage between A0 and A1. Take the AC voltage down to the lowest scale on the volt
meter. One probe will be inserted into the ground pin for A0. The other probe will be inserted into
the ground pin for A1. Verify that the measurement is between 0 - 5 volts AC. If the measurement
is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server
cabinet.
Step 2. Measure the voltage between B0 and B1. Take the AC voltage down to the lowest scale on the volt
meter. One probe will be inserted into the ground pin for B0. The other probe will be inserted into
the ground pin for B1. Verify that the measurement is between 0 - 5 volts AC. If the measurement
is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server
cabinet.
Step 3. Measure the voltage between A0 and B0. Take the AC voltage down to the lowest scale on the volt
meter. One probe will be inserted into the ground pin for A0. The other probe will be inserted into
the ground pin for B0. Verify that the measurement is between 0 - 5 volts AC. If the measurement
is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server
cabinet.
Step 4. Measure the voltage between A1 and B1. Take the AC voltage down to the lowest scale on the volt
meter. One probe will be inserted into the ground pin for A1. The other probe will be inserted into
the ground pin for B1. Verify that the measurement is between 0 - 5 volts AC. If the measurement
is 5V or greater, escalate the situation. Do not attempt to plug the power cords into the server
cabinet.
Seitenansicht 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 93 94

Kommentare zu diesen Handbüchern

Keine Kommentare