Power up procedure 70
Power up procedure
Powering up the components
1. Verify that the gateway is connected to the power and is working in operation mode by viewing the
gateway LED status (on page 18).
o Connected—The gateway Active LED is either flashing or solid green and the Battery LED is off.
o Not connected—The gateway Battery LED is either flashing or solid red.
NOTE: The gateway must be active before powering up the base stations.
2. Using a small flathead screwdriver or the power switch toggle, turn on the base stations.
3. Verify that all base stations have connected to the gateway by viewing the base station LED status. This
process might take up to 5 minutes.
o Connected—The base station LED is off.
o Not connected—The base station LED is flashing red.
Base station LED status
There are three base station modes:
• Off
• Initial power up
• On and operating
The initial power up sequence corresponds to the following steps: