HP Environmental Base Station installed on a CRAH/CRAC 28
Callout Component Description
and humidity.
Installing the HP Environmental CRAH/CRAC (Dual)
Base Station
The CRAH/CRAC (Dual) Base Station consists of:
One base station for the supply airMeasures the supply air temperature and humidity
One base station for the return airMeasures the return air temperature (the average of the six sensors
on the array) and humidity
Installing the HP Environmental Base Station in the supply air stream
1. Install the base station in an unobstructed location under the floor plenum in front of the CRAH/CRAC
supply air stream, to ensure accurate supply air humidity readings.
HP recommends using cable tie wraps to secure the base station to an available support bracket.
NOTE: Do not attach a sensor array to the base station in the supply air stream. The sensors that
measure the temperature and humidity are located inside the base station.
Installing the HP Environmental Base Station in the return air stream
WARNING:
The CRAH/CRAC must be powered down and the fans must be stopped before you
access the return plenum for hardware installation.
1. Using the cable tie wraps, secure the base station to an unobstructed location or support beam in the
CRAH/CRAC return air stream.
2. Connect the data transfer cable from the HP Plenum Rated Sensor Array to the base station.
Installing the HP Plenum Rated Sensor Array in the CRAH/CRAC return air plenum