Hp Insight Control Bedienungsanleitung Seite 96

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 173
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 95
Insight Control disables the Next and Previous buttons during the reboot. To view the booting process
of the destination server, click Launch iLO, and then open the remote console.
To cancel the boot process and power down the destination server, click Cancel Booting.
7. Test the network connections and latency between the source-to-destination server and the
application-station-to-destination server. The results of a 2-second test initially appear.
8. To perform additional tests, select a test time in the Test network connections section, and then click
Test. The following test times are available:
2 seconds
5 seconds
10 seconds
30 seconds
60 seconds
If you cannot establish the source-to-destination or application-station-to-destination connection, the Next
button is disabled. Ensure that ports 51125 and 51126 are open between source and destination
servers.
If you establish the source-to-destination or application-station-to-destination connection but the network
test reports a transfer speed below 250 kb/s, the Next button is disabled.
96 Using Insight Control server migration to migrate servers
Seitenansicht 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 172 173

Kommentare zu diesen Handbüchern

Keine Kommentare