HP Z Virtual Workstation series Bedienungsanleitung Seite 41

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 111
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 40
Installing the server into the rack
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack.
Install the heaviest item first, and continue to populate the rack from the bottom to the top.
1
. Install the server and cable management arm into the rack. For more information, see the
installation instructions that ship with the 2U Quick Deploy Rail System.
2
. Connect peripheral devices to the server. For information on identifying connectors, see "
Rear
panel components on page 7."
WARNING! To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
3
. Connect the power cord to the rear of the server.
4
. Install the power cord anchors.
Installing the server into the rack 35
Seitenansicht 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 110 111

Kommentare zu diesen Handbüchern

Keine Kommentare