
3-12 Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: d-ch03 Installing Hardware Options-J.doc Last Saved On: 7/13/01 11:36 AM
Table 3-7
System Board Components
continued
Item Description Item Description
PCI expansion slot 4
(64-bit/33-MHz)
SCSI connector B
PCI expansion slot 5
(64-bit/33-MHz)
SCSI connector A
PCI expansion slot 6
(64-bit/33-MHz)
Fan cable connector
System maintenance
switch (SW1)
PPM slot 2
16-pin Remote
Management connector
Processor socket 2
30-pin Remote
Management connector
Processor socket 1
Power supply signal
header
PPM slot 1
Power supply connector IDE connector
Diskette drive connector DIMM slots
NOTE: Your server is configured for the appropriate switch settings at the factory.
Powering Down the Server
If you are adding hardware options to a new server that is not yet installed in a
rack or work area, install all hardware options before installing and powering
up the server.
If your server is already installed, you must power down the system before
adding non-hot-plug hardware options.
IMPORTANT: Before upgrading components, back up your server data.
To power down the server:
1. Shut down the operating system as directed in your operating system
instructions. This measure enables you to retain system power for use in
performing diagnostic or troubleshooting operations.
Kommentare zu diesen Handbüchern