
• Verify that electrical service wiring has been installed at the server’s predetermined location.
Refer to the respective product specifications for detailed requirements.
• Verify of any additional support equipment is properly installed and operational.
At installation time, the HP representative will supervise the delivery and unpacking of the equipment.
The representative must also review the crate with the customer to check that the shipping crates
have not been tampered with. When unpacking the equipment, verify the shipment is correct and
all equipment was delivered. Refer to the packing slip and the SKUs with the shipment.
NOTE: No part of the installation, from unloading the crated server from the delivery vehicle to
unpacking and placement, should be performed without the supervision of a HP representative.
This is a fundamental requirement for the safety of both the equipment and personnel.
Preparing a Pre-Installation Site Planning Guide
Prior to installation, the customer will complete a systems planning document such as the HP 3PAR
Systems Assurance and Pre-Site Planning Guide in cooperation with the local HP Sales Representative
or HP Systems Engineer.
The systems planning guide is a working document that contains the following information:
• Contact information for customer personnel and for HP technical sales, support, and service
personnel
• Implementation project plan
• Configuration information for the HP 3PAR Storage system to be installed, including system
configuration diagrams
• Shipping and delivery details and requirements
• Management workstation, SP, and network information
• Description of the customer environment
• Volume and RAID level planning information
• Customer training project plan
• Additional notes and comments regarding installation
• Current support matrix
• System technical specifications
• Systems Acceptance Certificate
• Customer Services installation checklist
Common Criteria Evaluated Configurations
The HP 3PAR StoreServ 10000 Storage systems using HP 3PAR OS 3.1.2.MU1 have been evaluated
to conform to Common Criteria Evaluation Assurance Level 2 when configured accordingly. For
more information about the Common Criteria and the specific of the evaluated configuration see
the HP 3PAR OS Common Criteria Administrator’s Reference.
Shipping and Acclimatization Requirements
Safe transport of HP 3PAR Storage systems requires the appropriate shipping containers. A separate
crate holds each storage system cabinet while drive magazine shipping containers hold a maximum
of thirty drive magazines each.
Shipping Requirements
A separate shipping container holds each storage system cabinet while drive magazine shipping
containers hold a maximum of 16 drive magazines each. Customers should examine the delivered
14 General Site Planning
Kommentare zu diesen Handbüchern