
Hardware options installation 36
4. Remove the mezzanine connector cover. Retain the cover for future use.
5. Install the mezzanine card. Press down above the connector to seat the board.
6. Install the access panel (on page 16).
7. Install the server blade ("Installing a server blade" on page 19).
8. Power up the server blade (on page 14).
HP Smart Array E200i Controller battery pack
option
The optional BBWC enabler provides the system with a means for storing and saving data in the event of
an unexpected system shutdown.
Kommentare zu diesen Handbüchern