
Hardware options installation 26
2. Prepare the hard drive.
3. Install the hard drive.
4. Determine the status of the hard drive from the hot-plug hard drive LEDs ("SAS and SATA hard drive
LEDs" on page 8).
5. Resume normal server blade operations.
Processor option
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
Kommentare zu diesen Handbüchern