
Hardware options installation 43
o Half-height device
o Full-height device
7. (Optional) When shipping a server with a full-height device installed, replace the front guide screw
with a shipping screw ("Installing the full-height media device shipping screw" on page 44).
8. Connect the data and power cables to the rear of the device:
IMPORTANT: If both SATA and PATA optical devices are installed simultaneously, only one
can boot at a time. Boot priority will go to SATA if media is inserted into the SATA optical
drive. Boot priority for PATA is not configurable. To boot PATA, remove the media from the
SATA optical device, or remove the SATA optical device.
Kommentare zu diesen Handbüchern