4 Installation Preparation Steps
NOTE: Preparation for the installation of any equipment in a Telco facility is dictated by the
Telcordia Technologies GR-1275-CORE Central Office Environment Installation/Removal Generic
Requirements. It defines everything from the Method of Procedure (MOP) that Telco customers
require to the crimping methods that are acceptable to how to secure cables. For example, tie
wraps are not permitted, all cables must be tied in place using waxed string.
Checking General Safety
Before installing a cabinet or connecting input power cables, verify that:
No input power cables that are routed, installed, and connected are energized.
Wiring complies with local practices or local electrical safety codes that apply to the particular
installation site.
The -48V DC input power cables are insulated, stranded copper and are the appropriate size
for each type of cabinet or connection. There should be no more than a 1.0-V drop throughout
the combined length of the cables, from the installation site power source to the lugs that fasten
to the cabinets.
The ground cables are stranded copper and are the appropriate size for each type of cabinet.
The installation site safety grounding system used to connect the cabinets minimizes development
of electrical potential within and between cabinets, which could create a shock hazard from
lightning or fault currents.
Gathering Necessary Tools
You need these tools for installing the cabinets and connecting the cables:
PurposeTool
Move racks from shipping pallet to final position.Caster kit for seismic racks
Protect components against electrostatic dischargeESD protection kit
Move shipping pallets to installation areaHeavy-freight-handling equipment
Prevent eye injury from flying particlesSafety glasses
Cut cable ties, banding straps, tape, and plastic wrappingCutters and utility knife
Reach to the top of the cabinet to install labels or ground
connection
Ladder or step stool
See components within cabinetFlashlight
Label cablesPens or pencils
Tap anchor bolts into the concrete floorThree-pound single-jack hammer
Ensure all system cabinets are levelLevel (minimum 24 inches long)
Loosen and tighten Phillips screws#2 Phillips screwdriver
Remove kickplates and side panels on seismic racksLarge flat-blade screwdriver
Loosen and tighten Torx screwsT-10, T-15, T20, T-25, and T-30 Torx driver
Checking General Safety 17