HP FB910 Betriebsanweisung Seite 1

Stöbern Sie online oder laden Sie Betriebsanweisung nach Nein HP FB910 herunter. HP FB910 Reference Guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
1
HP Scitex FB910 Printer
Preparing the printer for transport
Seitenansicht 0
1 2 3 4 5 6 ... 11 12

Inhaltsverzeichnis

Seite 1 - HP Scitex FB910 Printer

1 HP Scitex FB910 Printer Preparing the printer for transport

Seite 2

10 Figure 12 User-end cable connections to chassis 2. Remove the ink boxes (cartridges) and ink profilers the printer prior to transport. Be

Seite 3 - 1 Overview

11 6. Disconnect the foot switch. Figure 15 Foot switch connection 7. Disconnect the printer from the facility pneumatic air supply or comp

Seite 4 - 2 Printhead preparation

12 9. Use the 13mm wrenches or sockets to attach the wheels at the four corners of the printer. Figure 18 Wheel attachment 10. Rotate the l

Seite 5 - 2.2 Procedure

2 © 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties f

Seite 6

3 1 Overview There are three main areas that need to be attended to before moving the printer: 1. Preparation of the printheads 2. Preparatio

Seite 7 - 3 Carriage preparation

4 2 Printhead preparation This process empties all the ink from the printheads and consumes a quantity of printhead flush solution. Be prepared

Seite 8

5 2.2 Procedure 1. From the printer’s control panel, select “Tools | Maintenance | Printheads Procedures | Empty Heads (Fill with Air)”. Follo

Seite 9 - 4 Chassis preparation

6 7. Locate the right-slave printhead for each color and remove the air U-tube as shown in Figure 7. Figure 7 Removal of air U-tube from righ

Seite 10

7 3 Carriage preparation The carriage must be isolated from the rail to prevent damage to both the rail and the carriage wheels. When the print

Seite 11 - DesignatedLift Points

8 9. Place an absorbent pad on top of the Saran Wrap. The pad and the wrap are to prevent any seeping liquids from getting on the belt or into

Seite 12

9 4 Chassis preparation 4.1 Required tools and materials  Forklift with 45" long (about 144 cm) forks that span up to 42" (about 10

Kommentare zu diesen Handbüchern

Keine Kommentare