
3RZHU6ZLWFK 3DQHO DQG&LUFXLW%UHDNHUV 29
Operation
15 REMOTE/LOCAL Switch REMOTE position: Disk array is powered
on/off by the instructions from the CPU.
LOCAL position: Disk array is powered
on/off by the POWER ON/POWER OFF
switch.
Applies to both storage clusters.
16 IND TEST/CHK RESET Switch IND TEST position: The LEDs on
Operator Panel and CE Panel go on.
CHK RESET position: The PS ALARM
and TH ALARM are reset.
17 BS-ON LED (Amber) Indicates input power is available.
18 PS-ON LED (Green) Indicates the disk array is powered on.
Applies to both storage clusters.
19 Disk Control frame Circuit
Breaker
Breaker Turns off AC input power to storage
cluster 1.
20 Disk Control frame Circuit
Breaker
Breaker Turns off AC input power to storage
cluster 2.
21 Circuit Breaker (MAIN LINE
switch 1)
Breaker Turns off all AC input power.
22 Circuit Breaker (MAIN LINE
switch 2)
Breaker Turns off all AC input power.
7DEOH 3RZHU6ZLWFK3DQHODQG&LUFXLW%UHDNHUVFRQWLQXHG
Item Name Description Function
Kommentare zu diesen Handbüchern