Hp 3PAR Application Software Suite for VMware Bedienungsanleitung Seite 106

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 120
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 105
6.24
Scheduling Virtual Copies
3PAR Management Plug-In and Recovery Manager 2.1.0 for VMware vSphere User’s Guide
Figure 6-31. Successful Creation of Scheduled Task Dialog
A listing for the scheduled task is now shown in the Schedule List.
Figure 6-32. Schedule List with Task
NOTE: If a VM or Datastore is renamed or removed, the associated scheduled
tasks continues to run but is no longer manageable from the 3PAR Management
Plug-in and Recovery Manager for VMware vSphere scheduling interface. In this
case, the task needs to be manually removed from the Windows Scheduler.
NOTE: If the username associated with the user that created a scheduled task
changes, the defined task is no longer operational.
Seitenansicht 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 119 120

Kommentare zu diesen Handbüchern

Keine Kommentare