HP Vectra VEi7 Technical Information Seite 67

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 77
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 66
IST-2000-25187
Deliverable D4.3
Evaluation of Phase I Field Trial
TORRENT
IST-2000-25187 PUBLIC Page 67 of 77
RG-API available at RG+ at workshop time
Available LAMA delivered and tested using the WEB management interface for LAP.
Available RG-API installed and tested
Management at LAP and RG+
WEB based management software has been installed at LAP and RG+.
Remote Access
LAP and 2 RG+ have been configured to allow remote access.
Follow up last HW integration activity
A configuration where 2 RGs connected to the LAP via J500 ADSL modems reach a remote IP
PC has been tested and verified.
The configuration is shown in the next figure.
During the test phase both, the CLIP at Access network subsystem and the AAL5 switch, have
been tested. The AAL5 traffic received from the ADSL card is switched on to the IPB while the
CLIP is running at the Core Subsystem.
The two environments are shown in more detail in the next figures.
Figure 21: Configuration of the integration modules
J500
ADSL
MODEMS
CLIENT
CLIENT
LAP Flextel
Platform
HUB
ETH
10/100
J500
ADSL
MODEMS
CLIENT
CLIENT
LAP Flextel
Platform
HUB
ETH
10/100
Seitenansicht 66
1 2 ... 62 63 64 65 66 67 68 69 70 71 72 ... 76 77

Kommentare zu diesen Handbüchern

Keine Kommentare