HP Performance Optimized Datacenter 40c North
America
Maintenance and Service Guide
Abstract
This guide provides maintenance and service guidance for the HP Performance Optimized Datacenter 40c NA (HP POD 40c NA).
Part Number: 756850-001
December 2013
Edition: 1
Seitenansicht 0
1 2 3 4 5 6 ... 78 79

Inhaltsverzeichnis

Seite 1 - America

HP Performance Optimized Datacenter 40c North America Maintenance and Service Guide Abstract This guide provides maintenance and service guidance fo

Seite 2

Illustrated parts catalog 10 Front view shown Callout Electrical safety label Description 1 Danger sign Provides a reminder to users that the e

Seite 3 - Contents

Illustrated parts catalog 11 Item Electrical safety label Description 2 Panel schedule/circuit breaker table Lists the layout and designation for

Seite 4 - Contents 4

Illustrated parts catalog 12 Item Component Description 7 Dual power supplies with battery backup Provides 24 V DC power to the PLC, LED lighting,

Seite 5 - Contents 5

Illustrated parts catalog 13 Aisle clearances Cold aisle clearance The maximum protrusion of any installed IT component directly impacts the availab

Seite 6 - Illustrated parts catalog

Illustrated parts catalog 14 Hot aisle clearance Hot aisle clearance is defined as the distance from the rear of the rack to the hot aisle wall. The

Seite 7

Removal and replacement procedures 15 Removal and replacement procedures Safety considerations The HP POD 40c NA is listed to the UL 69050 standard

Seite 8

Removal and replacement procedures 16 Fire detection and suppression The fire detection and suppression system is a "Manufacturer Designed"

Seite 9

Removal and replacement procedures 17 2. Pull the filter down through the frame channels to remove the filter. Replacing the air filter 1. Angle

Seite 10

Removal and replacement procedures 18 Busway drop box The internal electrical busways provide a location to connect each of the drop boxes, which th

Seite 11

Removal and replacement procedures 19 4. Slide the hardware bracket to the right along the busway, completely disconnecting it from the busway drop

Seite 12 - HP POD 40c NA racks

© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties

Seite 13 - Aisle clearances

Removal and replacement procedures 20 4. Secure the busway drop box to the retaining hardware bracket by using a socket wrench to insert and tighten

Seite 14 - Replaceable components

Removal and replacement procedures 21 Removing the differential pressure sensor 1. Label the pressure sensor tube connection locations, and then re

Seite 15 - Safety considerations

Removal and replacement procedures 22 Door position contact Door position contacts are located on all doors and cabinets. You need a screwdriver and

Seite 16 - Air filter

Removal and replacement procedures 23 Drain pan sensor The HP POD 40c NA includes six heat exchanger condensate drains. One drain pan sensor is loca

Seite 17 - Replacing the air filter

Removal and replacement procedures 24 Heat exchanger drain pan sensor -or- Header drain pan sensor Replacing the drain pan sensor 1. Position th

Seite 18 - Busway drop box

Removal and replacement procedures 25 Header drain pan sensor 2. Route the wire through the flex tubing to the associated zone satellite box. 3.

Seite 19

Removal and replacement procedures 26 ECS touchscreen The ECS touchscreen is located on the door to the control panel inside the cold aisle of the H

Seite 20 - Differential pressure sensor

Removal and replacement procedures 27 Replacing the ECS touchscreen 1. Replace the ESC touchscreen through the front of the door (1), and then secu

Seite 21

Removal and replacement procedures 28 Removing the EPO button 1. Remove the two screws securing the tamper cover (1), and then remove the tamper co

Seite 22 - Door position contact

Removal and replacement procedures 29 Replacing the EPO button 1. Replace the EPO button (1), and then replace the four screws that secure the EPO

Seite 23 - Drain pan sensor

Contents 3 Contents Illustrated parts catalog ...

Seite 24

Removal and replacement procedures 30 EPO LED indicators The ECS cabinet contains white (1, 2, 6, 7), red (1,3), yellow (1,5), and green (4) EPO LED

Seite 25

Removal and replacement procedures 31 2. Unscrew the EPO LED indicator bulb. Replacing the EPO LED indicator 1. Screw the new EPO LED indicator b

Seite 26 - ECS touchscreen

Removal and replacement procedures 32 2. Push the module into the slot on the back of the ECS cabinet door until it clicks into place. EPO thermis

Seite 27 - EPO button

Removal and replacement procedures 33 2. Secure the thermister with tie wraps (2). External chilled water flow actuator The external chilled water

Seite 28 - Removing the EPO button

Removal and replacement procedures 34 2. Remove the four bolts securing the face plate (1), and then remove the face plate (2). 3. Disconnect the

Seite 29 - Replacing the EPO button

Removal and replacement procedures 35 Replacing the external chilled water flow actuator 1. Replace the actuator (1), and then secure the actuator

Seite 30 - EPO LED indicators

Removal and replacement procedures 36 Removing the external chilled water flow valve 1. Remove the external chilled water flow actuator. For detail

Seite 31

Removal and replacement procedures 37 You need an adjustable wrench or an appropriately sized box wrench for installation. Removing the external pr

Seite 32 - EPO thermister

Removal and replacement procedures 38 CAUTION: Power must be removed from the fan power assembly before removing or replacing a fan or fan bank.

Seite 33

Removal and replacement procedures 39 4. Remove the three screws that secure the fan in the assembly (1), and then partially remove the fan by pulli

Seite 34

Contents 4 External chilled water flow valve ...

Seite 35

Removal and replacement procedures 40 Fan bank There are three fan banks per cooling zone. CAUTION: Power must be removed from the fan power as

Seite 36

Removal and replacement procedures 41 6. Remove the fan bank by pulling it straight out (3). Replacing the fan bank 1. Insert the fan bank (1). 2

Seite 37

Removal and replacement procedures 42 Fire strobe light The HP POD 40c NA contains an internal fire alarm strobe light in the cold aisle and an exte

Seite 38 - Removing the fan

Removal and replacement procedures 43 Replacing the fire strobe light 1. Assemble the standard back box, the semi-flush plate, and the electric sou

Seite 39 - Replacing the fan

Removal and replacement procedures 44 Removing the humidifier 1. Hold the drain button on the humidifier exterior until the humidifier cylinder dra

Seite 40 - Fan bank

Removal and replacement procedures 45 10. Disconnect and remove the external electrical wiring from the housing (3). 11. Remove the four screws th

Seite 41 - Replacing the fan bank

Removal and replacement procedures 46 Replacing the humidifier 1. Replace the humidifier (1), and then secure the humidifier to the wall with four

Seite 42 - Fire strobe light

Removal and replacement procedures 47 6. Replace the humidifier cover (1), and then secure the cover with four screws (2). 7. Open the water suppl

Seite 43 - Humidifier

Removal and replacement procedures 48 2. Open and danger tag the associated circuit breaker in the ECS cabinet. The circuit breakers are identified

Seite 44 - Removing the humidifier

Removal and replacement procedures 49 a. Remove the screw securing the tab in the opening (1), and then slide the tab to the open position (2). b.

Seite 45

Contents 5 Rack specifications ...

Seite 46 - Replacing the humidifier

Removal and replacement procedures 50 Humidity sensor The HP POD 40c NA contains two humidity sensors, one in cooling zone 2 and one in cooling zone

Seite 47 - Humidistat

Removal and replacement procedures 51 2. Loosen the sensor wires by turning the nut counter clockwise (1), remove the sensor wires from the terminal

Seite 48 - Replacing the humidistat

Removal and replacement procedures 52 Replacing the humidity sensor 1. Replace the sensor (1), and then secure the sensor with two screws (2). 2.

Seite 49

Removal and replacement procedures 53 3. Replace the sensor cover (1), and then secure the cover with four screws (2). LED light Each POD contains

Seite 50 - Humidity sensor

Removal and replacement procedures 54 3. Remove the LED light assembly (2). Replacing the LED light 1. Place the LED light where you want to secu

Seite 51

Removal and replacement procedures 55 Removing the cold aisle temperature sensor 1. Remove the two screws that secure the sensor cover (1), and the

Seite 52

Removal and replacement procedures 56 Replacing the cold aisle temperature sensor 1. Replace the sensor tube, and then secure the tube with five cl

Seite 53 - LED light

Removal and replacement procedures 57 Temperature sensor (hot aisle) The HP POD 40c NA contains six temperature sensors in the hot aisle. You need

Seite 54 - Replacing the LED light

Removal and replacement procedures 58 3. Loosen the screw securing the wires (2), and then remove the sensor wires (3). 4. Remove the two screws t

Seite 55

Removal and replacement procedures 59 Replacing the hot aisle temperature sensor 1. Replace the sensor (1), and then secure the sensor with two scr

Seite 56

Illustrated parts catalog 6 Illustrated parts catalog Structural component identification The HP POD 40c NA documentation frequently refers to the s

Seite 57

Removal and replacement procedures 60 4. Replace the sensor cover (1), and then secure the cover with four screws (2). VESDA filter The VESDA filt

Seite 58

Removal and replacement procedures 61 2. Remove the 10mm screw that secures the VESDA filter (1), and then remove the filter (2). Replacing the VE

Seite 59

Periodic maintenance 62 Periodic maintenance Periodic maintenance overview Perform periodic inspections on the components in this section to ensure

Seite 60 - VESDA filter

Periodic maintenance 63 Component to be inspected Task Frequency Capable Party Condensate drain lines and p-trap Inspect and verify: • No blocka

Seite 61 - Replacing the VESDA filter

Periodic maintenance 64 2. Power down the IT equipment in the zone where the leak is located. 3. Determine the affected heat exchanger. 4. Close a

Seite 62 - Periodic maintenance

Periodic maintenance 65 Electrical Maintenance of the electrical components might require the following: • Expose personnel to high voltage. • All

Seite 63 - Leak detection maintenance

Periodic maintenance 66 Component to be inspected Task Frequency Capable Party Circuit breakers Panel breaker operational test (open and shut). A

Seite 64 - Humidifier (if installed)

Periodic maintenance 67 Component to be inspected Task Frequency Capable Party Suppression system Suppression system test As required by local c

Seite 65 - Electrical

Periodic maintenance 68 Component to be inspected Task Frequency Capable Party EPO System Test EPO NON-FUNCTIONAL TEST Mode Key Switch Test - rot

Seite 66

Periodic maintenance 69 Internal UPS and rack equipment that is purchased from HP is covered by a standard HP warranty and services contract, purcha

Seite 67 - Life safety

Illustrated parts catalog 7 • Regulatory compliance identification number—This product has been assigned a unique regulatory model number and is lo

Seite 68 - Third-party components

Specifications 70 Specifications General specifications Features Specifications Overall dimensions • Height—3.66 m (12 ft) • Length—12.19 m (40

Seite 69 - • Switchgear

Specifications 71 Fire alarm panel connections The electrical layout of the fire alarm system is as described in the schematic drawing supplied with

Seite 70 - Specifications

Specifications 72 Feature Specification Non-operating temperature* -29ºC to 54ºC (-20ºF to 130ºF) Operating humidity • 0% to 100% external • 10%

Seite 71 - Environmental specifications

Contacting HP 73 Contacting HP Before you contact HP Be sure to have the following information available before you call HP: • Active Health System

Seite 72

Regulatory information 74 Regulatory information Safety and regulatory compliance For safety, environmental, and regulatory information, see Safety

Seite 73 - Contacting HP

Glossary 75 Glossary AHJ authority having jurisdiction branch circuit The conductors and components following the last overcurrent protective devic

Seite 74 - Regulatory information

Glossary 76 PDU power distribution unit PLC programmable logic controller PPE personal protective equipment RU rack units structure Enclosure of

Seite 75 - Glossary

Documentation feedback 77 Documentation feedback HP is committed to providing documentation that meets your needs. To help us improve the documentat

Seite 76 - Glossary 76

Index 78 A air filter, removing 16 air filter, replacing 17 air filters 16 authorized reseller 73 B before you contact HP 73 busway drop b

Seite 77 - Documentation feedback

Index 79 H help resources 73 HP contact information 73 HP POD 40c NA racks 12 HP technical support 73 HP website 73 HP, contacting 73 hu

Seite 78 - Index 78

Illustrated parts catalog 8 Item Component Description 4 Fire alarm manual pull* Enables manual initiation of the fire system, which includes act

Seite 79 - Index 79

Illustrated parts catalog 9 WARNING: To avoid the risk of personal injury or loss of life, all personnel must comply with electrical warning label