
Operations 18
1.
Install the DIMM baffles.
2. Connect the hot-plug SAS/SATA cables ("Hot-plug SAS/SATA hard drive cabling" on page 45).
3. Connect the cache module capacitor cable ("Cache module capacitor cabling" on page 46).
4. Install the access panel (on page 16).
5. Install the server blade ("Installing a server blade" on page 26).
Kommentare zu diesen Handbüchern