HP Vectra VEi7 Technical Information

Stöbern Sie online oder laden Sie Technical Information nach PC / Workstation Barebones HP Vectra VEi7 herunter. HP Vectra VEi7 System information Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 77
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
IST-2000-25187
Deliverable D4.3
Evaluation of Phase I Field Trial
TORRENT
IST-2000-25187 PUBLIC Page 1 of 77
Project Number: IST-2000-25187
Project Title: TORRENT
Deliverable Security*: PU
CEC Deliverable Number: D4.3
Contractual Date of Delivery to the CEC: 30.11.2002
Actual Date of Delivery to the CEC:
Title of Deliverable: Evaluation of Phase I Field Trial
Work package contributing to the Deliverable: WP4
Type of Deliverable**: R
Author: Isabel Borges
Contributors: M.Potts, G.Grun (MCLab); R. Tolstra
(tesion); W. Payer (UST); I. Mountzouris
(Intracom); V. Apostolopoulou, P.
Karapanagiotis (TEMAGON); A.
Costoloni (Flextel); T. Konstali (Telenor);
P. Rolo (PTIN)
* Security: PU Public, PP - Restricted to other programme participants (including the Commission Services)
RE - Restricted to a group specified by the consortium (including the Commission Services)
CO - Confidential, only for members of the consortium (including the Commission Services)
** Type: R - Report, P - Prototype, D - Demonstrator, O - Other
Abstract:
This deliverable is concerned with the validation of the key functionalities of the first phase of
the TORRENT test-bed, covering the customer premises, access network and the local access
point. It will provide important input to phase two of TORRENT, especially the field trials. The
significance of the results to exploitation will also feature here.
Keywords: Field trial, functionalities, testing, network management, evaluation
Seitenansicht 0
1 2 3 4 5 6 ... 76 77

Inhaltsverzeichnis

Seite 1 - Mountzouris

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 1 of 77 Project Number: IST-2000-25187 Proje

Seite 2

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 10 of 77 In the Figure 2 (IPv4 case) the meas

Seite 3 - Executive Summary

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 11 of 77 TEMAGON – Field Trial Tests

Seite 4 - Table of Contents

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 12 of 77 3.2.2 PTIN Figure 5 shows the con

Seite 5

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 13 of 77 The proposed scenario will allow to

Seite 6 - 2 Objectives

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 14 of 77 3.2.3 Telenor This trial will be fo

Seite 7

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 15 of 77 Figure 9: Existing infrastructure

Seite 8

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 16 of 77 User equipment Each T-RG will at l

Seite 9 - 3.2 Phase 2 field trials

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 17 of 77 The terminals will use dynamic IP ad

Seite 10

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 18 of 77 Figure 11a tesion)) Backbone (partia

Seite 11 - SPLITTER

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 19 of 77 Figure 11b: Connection of Basel and

Seite 12

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 2 of 77 © This Deliverable is Copyright of t

Seite 13

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 20 of 77 Initial test set-up The figure belo

Seite 14 - TORRENT

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 21 of 77 Figure 13:IPv4 tesion set-up The co

Seite 15

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 22 of 77 New test set-up using IPv6 Since thi

Seite 16 - User terminals

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 23 of 77 Within a short timeframe the alterna

Seite 17

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 24 of 77 4 MCLab TORRENT testing 4.1 Resident

Seite 18

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 25 of 77 The access network is based on ADSL

Seite 19

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 26 of 77 Functions IPv4 IPv6 Description I

Seite 20 - Initial test set-up

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 27 of 77 Functions IPv4 IPv6 Description I

Seite 21

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 28 of 77 Functions IPv4 IPv6 Description I

Seite 22

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 29 of 77 4.2 ISDN – Intracom netMod Network

Seite 23

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 3 of 77 Executive Summary This deliverable pr

Seite 24 - 4 MCLab TORRENT testing

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 30 of 77 • Plug and play installation • Web-

Seite 25

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 31 of 77 Figure 18. RG API architecture 4.2.

Seite 26

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 32 of 77 forwarding get_forwarding getforwar

Seite 27

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 33 of 77 • Through the Linux NETLINK API. In

Seite 28

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 34 of 77 In Figure the MCLab configuration of

Seite 29 - 4.2 ISDN – Intracom netMod

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 35 of 77 •Remote access to the RGs for remote

Seite 30

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 36 of 77 From remote you can log in to the Ma

Seite 31 - Set (enable/disable) IPv4

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 37 of 77 Destination Gateway Genmask Fl

Seite 32

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 38 of 77 login: root, pw: icom-rg login torre

Seite 33

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 39 of 77 NETMASK=255.255.255.0 BROADCAST=192.

Seite 34 - Network configuration

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 4 of 77 Table of Contents Executive Summary.

Seite 35 - LAP (Flextel System)

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 40 of 77 GATEWAY=192.168.1.1 Configuration o

Seite 36 - •/root/SWITCH/aal5swd

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 41 of 77 subnet 193.72.156.224 netmask 255.25

Seite 37 - RG 1 & 2

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 42 of 77 •http://193.72.156.84 (only remote u

Seite 38

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 43 of 77 The file “config” defines interfaces

Seite 39

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 44 of 77 DOMAIN=mclab.ch # untouch parameter

Seite 40

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 45 of 77 echo "Hostname (fully qualified

Seite 41

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 46 of 77 echo "nameserver ${NAME

Seite 42

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 47 of 77 p=`pidof dnsmasq` if [ "${DHCP

Seite 43 - Deliverable D4.3

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 48 of 77 iptables -F iptables -t nat -F iptab

Seite 44

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 49 of 77 route add -net 192.168.0.0 gw 192.16

Seite 45

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 5 of 77 Abbreviations ...

Seite 46

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 50 of 77 4.4 Results of the tests At the last

Seite 47

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 51 of 77 F11_Test 1 – Support different user

Seite 48

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 52 of 77 F4_Test8 TC Name: Quality of the

Seite 49

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 53 of 77 Packet size (Byte) Response time (m

Seite 50

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 54 of 77 •Charging information (on request) •

Seite 51

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 55 of 77 TC Name: Emergency access to a basic

Seite 52 - F4_Test8

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 56 of 77 oAny other type of system failure (c

Seite 53 - F8_Test4

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 57 of 77 Measurement equipment used Simple ti

Seite 54 - F12_Test1

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 58 of 77 •Error tolerance (does the system al

Seite 55

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 59 of 77 ADLS Modem J500 at RG1 The ADSL li

Seite 56 - F12_Test2

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 6 of 77 1 Introduction The first deliverable

Seite 57 - F12_Test5

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 60 of 77 The ADSL link is not very stable and

Seite 58

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 61 of 77 6 Conclusions and Recommendations Th

Seite 59 - 5 Analysis of Results

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 62 of 77 It is recommended that field trials

Seite 60

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 63 of 77 7 Annex 1 7.1 Address Structure of t

Seite 61

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 64 of 77 o Net Mask o 255.255.255.224 Lo

Seite 62

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 65 of 77 o In the LAP actual configuration y

Seite 63 - IP Address Configuration

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 66 of 77 2 ADSL Intracom Modem – J500 RG+ 1

Seite 64

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 67 of 77 RG-API available at RG+ at workshop

Seite 65 - 7.4 TTCP and NETPERF

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 68 of 77 IPBJ500ADSLAccess Network SubsystemC

Seite 66 - ADSL Connection

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 69 of 77 Path under testIPBJ500ADSLAccess Net

Seite 67

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 7 of 77 3 Description of Field Trials 3.1 Pha

Seite 68

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 70 of 77 7.5.1 Throughput IPB Figure 24: Th

Seite 69

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 71 of 77 Figure 25: Delay measurements

Seite 70 - 7.5.1 Throughput IPB

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 72 of 77 7.5.2 Throughput Core Blade Figure

Seite 71

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 73 of 77 Figure 27: Delay measurements

Seite 72

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 74 of 77 7.5.3 Throughput Core Blade – RG1

Seite 73

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 75 of 77 Figure 29: Delay measurements From

Seite 74

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 76 of 77 Abbreviations ADSL Asynchronous D

Seite 75

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 77 of 77 8 References [1] TORRENT deliverab

Seite 76 - Abbreviations

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 8 of 77 The experiments foreseen for validati

Seite 77 - 8 References

IST-2000-25187 Deliverable D4.3 Evaluation of Phase I Field Trial TORRENT IST-2000-25187 PUBLIC Page 9 of 77 3.2 Phase 2 field trials 3.2.1 TEMAG

Kommentare zu diesen Handbüchern

Keine Kommentare